Al Rayyan Stadium (FIFA 2022 STADIUM)

We are glad that we were a part of Ahmad Bin Ali Stadium (Al Rayyan Stadium) rebuilt for the 2022 FIFA World Cup at Qatar. The 40,000-seater air-cooled open stadium with a total load of 12,800 TR has a GSAS (Global Sustainability) rating of 4. Its distinctive facade, created using a cutting -edge parametric design, contributes significantly to its cooling. The unique patterns in the façade represent different aspects of Qatan culture kno wn as Naquish patterns that character-ise different aspects of the country, the importance of family, the beauty of the desert, the native flora and fauna and local and intemational trade. The fifth shape, a shield brings together the strength and unity of the city of Al Rayyan.
Project Owner:
Supreme Committee forDelivery & Legacy
Project Cost :
342,000,000 USD
Client :
Al Tasnim Enterprises
Location :
Qatar
Year Completed:
2022
SIC SCOPE
Building Information Modeling (BIM) -Development of LOD 500 BIM Model from LOD 200 IF model for Complete GRC Facade & Dunes including coordination of fixing with the Steel work Contractor. SIC deployed a BIM team on-site to coordinate closely with the client's team.
We are happy for our achievement
COMPLETED PROJECTS
TEAM MEMBERS
YEARS EXPERIENCE
Get in touch
Have a question or want to speak with our team of experts? We’re happy to help. We typically respond within 1 business day.
Business Hours
Mon–Fri · 9am–6pm
Email Us
info@sic.lkOur Global Offices
Sri Lanka (HQ)
7th Floor, No. 7-7/1, Cotta Terrace, Dr. N. M. Perera Mawatha, Colombo 08.
United Kingdom
Bye Ways, Stroud Farm Road, Holyport, Maidenhead, SL6 2LH, United Kingdom
United Arab Emirates
Meydan Grandstand, 6th Floor, Meydan Road, Nad Al Sheba, Dubai.
For appointment requests, please use our online booking form or call our office.